Search:

WVWA Salem Turnpike Sanitary Sewer

The Authority replaced approximately 3,000 LF of 8- and 10-inch sanitary sewer along Salem Turnpike with 18-inch sewer. The project’s goal was to upsize the undersized sewer to meet current and future wastewater demands, prevent future sanitary sewer overflows, and decrease the potential for infiltration and inflow (I&I).

 

Draper Aden Associates provided utility design, surveying, geotechnical investigation, and SUE.