Search:

Archive

Wvwa Salem Turnpike Sanitary Sewer

WVWA Salem Turnpike Sanitary Sewer

[vc_row content_aligment="center"][vc_column][vc_column_text] The Authority replaced approximately 3,000 LF of 8- and 10-inch sanitary sewer along Salem Turnpike with 18-inch sewer. The project’s goal was to upsize the undersized sewer to meet current and future wastewater demands, prevent future sanitary sewer overflows, and decrease the potential for infiltration and inflow (I&I).   Draper Aden Associates provided utility design, surveying, geotechnical investigation, and SUE. [/vc_column_text][/vc_column][/vc_row]...

Continue Reading
Henrico Mimosa

Henrico Mimosa Park Water Rehabilitation

[vc_row content_aligment="center"][vc_column][vc_column_text] The purpose of this project was to abandon an old private water system, including abandonment of approximately 4,055 LF of existing 2 ¼-inch water mains, abandonment of two existing interconnections, flushing hydrants, and transferring 50 water services to existing water mains along Aiken Drive, Homeview Drive, and Parham Road. This project also included the installation of approximately 440 LF of 8-inch ductile iron water main in the right-of-way of St. Martins Lane.   Draper Aden's scope included a complete site walkover, SUE, survey, geotechnical engineering, design, bidding, and construction administration services. [/vc_column_text][/vc_column][/vc_row]...

Continue Reading
Nc parks and recreation - Park Designs and parking lot design- civil engineering firm

Town of Erwin W.N. Porter Park

[vc_row][vc_column][vc_column_text]The Draper Aden Associates team worked with the Town of Erwin to create and file an application with the North Carolina Parks and Recreation for a PARTF grant to upgrade a 30+ year old well-loved and heavily used recreational park within the Town. The grant application was awarded in 2014 for a total project budget of approximately $200,000. The park site included two intersecting streams and a mature growth of well-spaced trees. The team integrated these natural features into the overall park design and added new walking trails, benches, a new parking lot, a new picnic shelter, new grills and a new toddler playground. In addition, the existing parking lot, picnic shelter, and basketball court were fully renovated and given a brand new look.[/vc_column_text][/vc_column][/vc_row]...

Continue Reading
Kg Utl 4

King George County Annual Utilities

[vc_row content_aligment="center"][vc_column][vc_column_text] Draper Aden Associates has provided engineering services to King George County and the King George County Service Authority (KGCSA) under an Annual Contract since 2000. Our tasks have included engineering, planning, and design for various water and sewer projects including a comprehensive utility master plan for the County. Draper Aden has also provided the County with environmental, surveying, geotechnical engineering, and site planning services. [/vc_column_text][/vc_column][/vc_row]...

Continue Reading
Town of Edenton NC - UST Removal, Site Development Plan, Environmental Services, Soil Testing Service

Town of Edenton Environmental Services

[vc_row][vc_column][vc_column_text]Draper Aden conducted all Brownfields activities to assist the Town’s economic development efforts in marketing a valuable parcel of land. At the recommendation of the Town, assisted the prospective developer with the Eligibility Letter, Brownfield Application, assessment activities and negotiated the draft and final Brownfields Agreement. We saved the client almost $500,000 by using site development plans and soil assessment result as basis to remove the need for soil excavation as part of the Brownfields Agreement.   Draper Aden performed all underground storage tank (UST) removal activities for a property transaction that involved the Town’s right-of-way, including soil excavation, groundwater sampling and NCDENR reporting to obtain a Notice of No Further Action.   We also conducted a major soil assessment for the Edenton Chowan Economic Development Partnership at a firing range within a planned industrial park. This project required nearly constant communication with the NCDENR, Division of Waste Management Hazardous Waste Section.   Additional services included: -...

Continue Reading
Rwsa 2

RWSA Term Contract for Surveying Services

[vc_row][vc_column][vc_column_text]Over the past five years, Draper Aden Associates has performed surveying services and worked closely with RWSA to serve the Charlottesville and Albemarle community. The following projects were completed under this term contract: - Hilltop Street Encroachment boundary survey - Camp Holiday Trail minor division - Easement plats for pipeline abandonment at Kohl’s - SUE Level A North Rivanna - Sugar Hollow Base Map and spot elevations - Topographic survey and conceptual drainage design - SUE Level A Crozet Water Treatment Plant - SUE Level A Woodbrook - Stake Thatch easement - Stake Thatch easement post clearing - Meadow Creek Interceptor as-built survey - Sugar Hollow Reservoir topographic survey - Clarifier #3 laser scan survey - Ivy Transfer spot elevations - Moores Creek drone flight[/vc_column_text][/vc_column][/vc_row]...

Continue Reading
Portsmouth Utl 1

Portsmouth Downtown Water and Sewer

[vc_row content_aligment="center"][vc_column][vc_column_text] As a part of the overall Downtown Revitalization Effort, Impact Zone 1, Draper Aden provided surveying scanning and utilities design services for 10,200 LF of 8-inch to 16-inch diameter gravity sewer, 9,530 LF of 8-inch to 16-inch diameter water main, and 920 LF of 12-inch diameter sanitary force main within a 70 acre portion of Downtown Portsmouth. The land use in the project area is heavily developed with mostly commercial properties and City of Portsmouth buildings. In addition to being the designers for the project, Draper Aden provided program management services during the design and construction phases of the project. As part of these services, Draper Aden provided detailed construction sequencing plans, construction phasing schedules, and alternative access options for property owners. Draper Aden also assisted the City with public relations matters via public meetings, newsletters, property owner emails, and content for a project specific website.   For Impact Zone 2,...

Continue Reading
Richmond International Airport- Civil Engineering Firm Project

Richmond International Airport

[vc_row content_aligment="center"][vc_column][vc_column_text] Over the years, Draper Aden Associates has provided numerous services for the Richmond International Airport. Services included structural engineering, survey, geotechnical engineering, stormwater and sanitary sewer mapping, construction stakeout, site planning and engineering, and subsurface exploration. Projects have included New Terminal Building, Arresting System Removal at Air National Guard (ANG), SIDA & AOA Security/Access Gates Upgrades, Richmond Commuter, Airport Receiving Warehouse, Central Plant Building, Hertz Administration Building and Car Wash, Alamo Car Rental Main Lot Renovation, ATCT and Base Building geotechnical investigation, Airport Runway 220 core drilling, and aviation hangars relocation, alterations, and additions. [/vc_column_text][/vc_column][/vc_row]...

Continue Reading